The current projects include all urgent rehabilitation works with emphasis on the works required to improve the reliability of the plant operation, both in term of quantity and quality. Below is a list of projects with images. This can also be viewed as an interactive Flash Image Gallery
here.
The works already completed or under implementation include:
Overhaul Intake Pump No. 4
View Image
Overhaul Intake Pump No. 3
View Image
Install new sludge scrapper in Sedimentation Tank No. 6
View Image
Install AMF panel (for generator's operation)
View Image
Install new generator - 1500 KVA
View Image
Install new panel (for utility equipments' operation)
View Image
Install new flow meter on distribution pipe ND 900
View Image
Install new motorized valve on distribution pump No. 2 and 4's outlet pipes
View Image
Install 315 KW inverter on distribution pumps
View Image
Install 200 KW inverter on distribution pumps
View Image
New Online Computerized Monitoring System
View Image
Installation of new Package WTP's submersible pump
View Image
Lining and coating with epoxy - 12 Filter Tanks
View Image
Installation of new main power panel
View Image
Overhaul blower
View Image
Installation of new Tube Settlers in 6 Sedimentation Tanks (on going)
View Image
Replacement of the Raw Water Pumps
View Image
Addition of temporary screens at the intake
View Image
New automatic dosage of coagulant according to the raw water turbidity
View Image
Improvement of the Flocculation tanks isolating gates
View Image
New Flocculators control panel
View Image
Repair of the sedimentation tanks clarified water troughs
View Image
Repair of the sedimentation tanks scraper cable system and new control panel.
View Image
Rehabilitation of 3 filters and backwash pumps
View Image
Addition of a new Chlorinator and overhaul of the existing one
View Image
Rehabilitation of the chlorine leakage neutralization system
View Image
Clear water tanks manual valves replaced by motorized one
View Image
Installation of a new magnetic flowmeter (Distribution)
View Image
Rehabilitation of the main electrical panels
View Image
New Data Control system and on-line recorders (PH, Turbidity, Residual Chlorine)
View Image
New Laboratory instruments
View Image